Acceptance checkpoints Fieldwork Follow editors to see construction

Hydropower engineering, masonry projects are an important step in the decoration, because hidden under the hard-mounted, but also related to the whole house of hydropower event, located in the very high frequency of bathroom, kitchen and other areas, so be sure sloppy. Today, Xiao Bian took everyone to the two work sites that were carrying out hidden projects. Learn some acceptance points!

Construction progress: hydropower project

Basic situation: more equipment, more complex wiring

Here is a covert project, at a glance you can see how complex the hydroelectric wiring of the villa is, which is unmatched by the apartment. But our focus is still to start with the most basic, to see if the details meet the 3.15 standard? Because there are no large areas in small places such as lazy. Facts have proven that Zhixian’s strict requirements in this area have never changed because of the size of the project.

All rooms are laid strictly on a horizontal and vertical line, and no tee is used. The lines are smooth.

Here is the bathroom on the first floor, the masters have already painted waterproof.

The wiring near the wall is fixed with a pipe clamp, which ensures the firmness of construction.

At the intersection of strong and weak electricity, the master will carefully wrap the foil to prevent mutual interference.

There must be a certain distance between strong and weak electricity, otherwise signal interference may occur in the future.

The hot and cold water pipes are punched separately, and there is a certain distance between the two to prevent future condensation.

Construction progress: clay construction

Basic situation: mostly light colors, tiles are very expensive

People who have been to the villa generally know that there are a few places where the movement and the number of bricks and tiles in the inside are a few hundred yuan. Moreover, unlike the traditional paving method in apartment buildings, it is difficult to make spells, and the process is more complicated. The same is true of this villa. Fortunately, the masonry masters are all very experienced and have not yet fully completed, they can already imagine the appearance of the finished product.

Paving tiles are most afraid of emptying. The hollowing out of tiles is closely related to cutting corners. Xiao Bian tested it on the spot. There was no such problem.

After the entire tile is finished, the master will immediately wipe away the cement and other foreign materials on the brick surface with a damp cloth to keep the surface tidy.

Hydroelectric installation hydropower acceptance hydropower reform hydropower stage mudstone engineering clay project acceptance

Welded neck flange not easy to  distortion, good sealing, widely used, butt thinning transition weld joints ,horn shape, avoid shape change when welding in high temperature. applicable to high temperature pipeline, high pressure and low temperature pipeline, normally used to connect  pipes and valves which PN is greater than 2.5MPa; also used to transport expensive, flammable, explosive media pipeline.

Product:Welding Neck Flange 
Size:DN10-DN2500
Materials: 20#.A105.Q235A.12Cr1MoV.16MnR.15CrMo.18-8.321.304.304L.316.316L
Pressure: Pn2.5-Pn320,Class150-Class2500,5K-30K
Standard:ASME B16.5ASME.B16.47.DIN2573.2572.2631.2576.2632.2633.2543.2634.2545,JIS 2220
Crafts: Forging 
Connection: Welding,Bolt. 
Package: Wooden boxes,Wooden pallets,According to customer requirements.
Brand Name: HY 
Place of Origin: China (Mainland) 
Certification: ISO.UKS.SGS.BV 
Application: Chemical, Water, Oil and gas, Electricity
So flange -wn flange-Carbon steel flanges-gost flange

Welding Neck Flange

Welding Neck Flange,Weld Flange ,Long Weld Neck Flange ,Reducing Weld Neck Flange

CANGZHOU HAOYUAN PIPE FITTINGS MFG CO.,LTD , https://www.pipefitting-china.com