Rough Housing Acceptance Standards Blank House Acceptance Points

The acceptance of a rough house is often an overlooked step by many homeowners. However, it's one of the most critical phases in the entire home buying process. Don’t skip this essential step just because you're excited about your new keys or Other initial impressions. A thorough inspection at this stage can prevent countless headaches during future renovations and ensure that everything is set up for quality work down the line.

Rough Housing Acceptance Standards – Blank House Acceptance Points

First, the acceptance criteria of rough housing 1. **Exterior finishes are complete** All exterior elements, including balconies, railings, and rain covers, should be fully completed as per the design plans. 2. **Public areas and utilities are properly installed** Common areas, public facilities, and all kinds of pipelines (water supply, drainage, rainwater, heating, etc.) must be installed according to specifications. Electrical components like distribution boxes, sockets, switches, and lighting fixtures should also be in place and tested. 3. **Pipeline testing and commissioning** All pipelines need to undergo water flow tests, pressure tests, ball passage tests, and heating system checks to ensure they function correctly. 4. **Roof waterproof test** The roof must be tested with water storage and watering to check for leaks or weaknesses in the structure. 5. **Interior wall and floor inspection** Each room’s interior walls should be plastered, leveled, and free from cracks. The concrete floors must be smooth, even, and well-compacted to avoid future issues. 6. **Strict waterproofing measures** Areas requiring waterproofing, such as bathrooms and kitchens, must follow strict construction standards. Two water storage tests should be conducted to confirm no leakage occurs. 7. **Floor drain and slope compliance** Ensure that floor drains and slopes are designed properly to allow proper water drainage without pooling or leaks. 8. **Cement floor height considerations** The height of the cement floor in each room should be measured carefully to accommodate future flooring or renovation needs.

  

Second, key points in rough housing acceptance 1. **Doors and windows** Doors are often forgotten during inspections. After unlocking, take time to check for scratches, dents, and proper alignment. For windows, inspect the frame, glass, and overall functionality, ensuring they open and close smoothly and seal properly. 2. **Walls and floors** Check the flatness of walls and floors. Uneven surfaces can cause problems during tiling or flooring. Use a straightedge or level to detect any irregularities. Tap the walls with a small hammer to check for hollow spots. 3. **Electrical systems** Test all outlets and light fixtures. Use a simple voltage tester or even a phone charger to confirm electricity is working properly in every room. 4. **Water supply and drainage** Pour water into the pipes to check for blockages. In bathrooms, ensure the waterproofing is adequate and have a professional conduct a 24-hour water test before starting renovations. 5. **Ventilation system** Don’t overlook the ventilation system. Check flues and exhaust ducts for proper installation and function, as these are crucial for daily living. In summary, the rough house acceptance is a vital step that shouldn't be rushed or ignored. Taking the time to inspect every detail now can save you a lot of trouble later on. It's not just about the look of the house — it's about ensuring everything works properly for a comfortable and safe living environment. #HomeInspection #RoughHouseAcceptance #RenovationTips #NewHomeChecklist #HomeMaintenance #RealEstate #PropertyInspection #HomeBuying #ConstructionQuality #DIYHomeCheck

Eye Nuts

Lifting Eye Nut,Nut Eyes,Eye Bolt With Nut,Stainless Steel Eye Nut

Kunshan Zhonggu Precision Hardware Co., Ltd. , https://www.zgfastener.com